For Data Center Operators & C-Suite Infrastructure Leaders

The Cooling
Cost Crisis.

Data centers spend up to 40% of total energy on cooling. AC Flush delivers 20–30% efficiency gains — converting one of the largest line items on the facility P&L into a measurable, recurring reduction in operating cost.

40%
Of Energy Spent
On cooling alone
20–30%
Efficiency Gain
Post-treatment
50MW–1GW
Facility Range
≈ 14,200 – 284,000 tons of cooling
Billions
Global Opportunity
In annual savings
01The Problem

Cooling Is The
Biggest Bill on the Floor.

As AI workloads scale and rack density climbs, cooling demand is reaching critical levels. Most of that spend is silently wasted by degraded HVAC efficiency — invisible to operations, fatal to PUE.

01
40%
Energy Spent on Cooling

A 100MW facility at $0.07/kWh spends over $24M annually on cooling alone — before any efficiency losses are accounted for.

02
30%
Efficiency Lost Over Time

Oil fouling is the silent culprit — lubricant migrates from compressors and coats evaporator and condenser coils, insulating heat-transfer surfaces and steadily eroding HVAC performance year over year.

03
$0
Typically Spent on the Fix

Most operators treat cooling inefficiency as a fixed cost. AC Flush eliminates the root cause and restores efficiency to near-new levels.

02The Calculator

Build Your Savings Model.

Adjust the facility size, energy rate, and efficiency gain to model a customized projection for any data center, anywhere in the world.

100 MW
50 MW500 MW1 GW
$0.070
$0.040$0.090$0.150
40 %
30 %40 %50 %
25 %
20 %25 %30 %
Annual Energy Savings
$6.13M
Per year — recurring for the life of the facility
Monthly Savings
$511K
Daily Savings
$17K
Total Annual Energy Bill
$61.32M
Annual Cooling Cost
$24.53M
Treatment Investment & ROI
Cooling Capacity
28,400
tons
AC Flush Required
28,400
oz @ 1 oz / ton
One-Time Investment
$1.42M
$50 / oz
Payback
2.8 mo
432% Year-1 ROI
Year-1 Net (Savings − Investment)
$4.71M
5-Year Net Value
$29.24M
Cooling Spend — Before vs After
Before Treatment$24.53M
After AC Flush$18.40M
Annual Savings Reclaimed$6.13M
03Five Year Projection

Savings That Compound.

Treatment pays back in months. The efficiency gain continues delivering value every operating hour — for the life of the facility.

Cumulative Savings — 5 Year View
$30.66M
Cumulative
Annual
$30.66M
$23.00M
$15.33M
$7.67M
$0
$6.13M
$12.26M
$18.40M
$24.53M
$30.66M
Year 1
Year 2
Year 3
Year 4
Year 5
YearCooling CostInvestmentAnnual SavingsCumulative Net
Year 1$24.53M$1.42M$6.13M$4.71M
Year 2$24.53M$6.13M$10.84M
Year 3$24.53M$6.13M$16.98M
Year 4$24.53M$6.13M$23.11M
Year 5$24.53M$6.13M$29.24M
5-Year Total$122.64M$1.42M$30.66M$29.24M
04Savings By Facility

Scale The Model
Across Your Fleet.

From 50MW edge sites to gigawatt hyperscale campuses — the recurring savings scale linearly with capacity.

Facility Size
50 MW
14,200 tons of cooling
Annual Savings
$3.07M
$256K / month
$15.33M over 5 years
Investment
$710K
Payback in 2.8 mo
Facility Size
100 MW
28,400 tons of cooling
Annual Savings
$6.13M
$511K / month
$30.66M over 5 years
Investment
$1.42M
Payback in 2.8 mo
Facility Size
250 MW
71,000 tons of cooling
Annual Savings
$15.33M
$1.28M / month
$76.65M over 5 years
Investment
$3.55M
Payback in 2.8 mo
Facility Size
500 MW
142,000 tons of cooling
Annual Savings
$30.66M
$2.56M / month
$153.30M over 5 years
Investment
$7.10M
Payback in 2.8 mo

The Cooling Bill
Becomes an Asset.

Operators worldwide are spending billions annually on cooling costs they've accepted as fixed. AC Flush converts that fixed cost into a recurring efficiency gain — 20–30%, year after year, from edge to hyperscale.

For data center leadership, this is one of the largest untapped cost-reduction levers in enterprise infrastructure. Every facility treated is OPEX reclaimed, PUE improved, and capacity freed — permanently.

Next Step
Schedule an executive briefing for your facility.
Request Briefing →