The Cooling
Cost Crisis.
Data centers spend up to 40% of total energy on cooling. AC Flush delivers 20–30% efficiency gains — converting one of the largest line items on the facility P&L into a measurable, recurring reduction in operating cost.
Cooling Is The
Biggest Bill on the Floor.
As AI workloads scale and rack density climbs, cooling demand is reaching critical levels. Most of that spend is silently wasted by degraded HVAC efficiency — invisible to operations, fatal to PUE.
A 100MW facility at $0.07/kWh spends over $24M annually on cooling alone — before any efficiency losses are accounted for.
Oil fouling is the silent culprit — lubricant migrates from compressors and coats evaporator and condenser coils, insulating heat-transfer surfaces and steadily eroding HVAC performance year over year.
Most operators treat cooling inefficiency as a fixed cost. AC Flush eliminates the root cause and restores efficiency to near-new levels.
Build Your Savings Model.
Adjust the facility size, energy rate, and efficiency gain to model a customized projection for any data center, anywhere in the world.
Savings That Compound.
Treatment pays back in months. The efficiency gain continues delivering value every operating hour — for the life of the facility.
| Year | Cooling Cost | Investment | Annual Savings | Cumulative Net |
|---|---|---|---|---|
| Year 1 | $24.53M | $1.42M | $6.13M | $4.71M |
| Year 2 | $24.53M | — | $6.13M | $10.84M |
| Year 3 | $24.53M | — | $6.13M | $16.98M |
| Year 4 | $24.53M | — | $6.13M | $23.11M |
| Year 5 | $24.53M | — | $6.13M | $29.24M |
| 5-Year Total | $122.64M | $1.42M | $30.66M | $29.24M |
Scale The Model
Across Your Fleet.
From 50MW edge sites to gigawatt hyperscale campuses — the recurring savings scale linearly with capacity.
The Cooling Bill
Becomes an Asset.
Operators worldwide are spending billions annually on cooling costs they've accepted as fixed. AC Flush converts that fixed cost into a recurring efficiency gain — 20–30%, year after year, from edge to hyperscale.
For data center leadership, this is one of the largest untapped cost-reduction levers in enterprise infrastructure. Every facility treated is OPEX reclaimed, PUE improved, and capacity freed — permanently.